The price of natural gas on the open wholesale market is formed on the basis of quoted prices of UEEX LLC. For the present moment the Ukrainian Energy Exchange is the only source of market prices for natural gas. The procedure for determining quotation prices and other forms of informing about gas prices by UEEX LLC are in the presentation.

Subscribe to Telegram channel «UEEX - natural gas»

Dear users!
Begins from July 1, 2022, the publication of UEEX LLC quotation prices and other price indicators is carried out in UAH excluding VAT, by the specified date the information is displayed without changes, that is, including VAT.

Quoted prices for natural gas *


Resource Date (the last date of sale) Terms of delivery Terms of payment Sales volume, thousand cubic meters. m. Quoted price, UAH per thousand cubic meters More detailed

Quoted prices for natural gas under the terms of delivery "commercial natural gas metering unit" **


Resource Date (the last date of sale) Terms of delivery Terms of payment Sales volume, thousand cubic meters. m. Quoted price, UAH per thousand cubic meters More detailed

Weighted average prices of a monthly resource of natural gas *

according to results of electronic exchange trading on LLC "Ukrainian Energy Exchange" as of 17.03.2026

The weighted average price of natural gas of a monthly resource is calculated as a cumulative total by dividing the total value of transactions concluded on the exchange for the purchase and sale of the corresponding monthly resource on the terms of delivery to the VTЗ GTS of Ukraine by the amount of the volume of purchase and sale of such a monthly resource under the corresponding concluded contracts during the entire period of its sale up to and including the specified date. The methodology for calculating the price of a monthly resource of natural gas is posted here.

Please note that in the absence of quoted prices for a monthly resource of natural gas on a certain trading day, the weighted average price prevailing for such a monthly resource on the previous trading day is applied.

UAH   EUR

Resource
(price fix date)
Weighted average price (on all payment terms),
UAHEUR/
thousand cub. m
Weighted average price (prepayment),
UAHEUR/
thousand cub. m
Weighted average price (after payment),
UAHEUR/
thousand cub. m
March 2026
(09.03.2026)
19 970,96395,1319 986,42395,4419 718,00390,13
February 2026
(23.02.2026)
20 466,58401,9620 455,31401,7422 100,00434,04
January 2026
(19.01.2026)
19 508,49386,7919 579,44388,1919 140,00379,48
December 2025
(19.12.2025)
20 383,62411,0120 255,94408,4420 814,00419,69
November 2025
(20.11.2025)
21 022,56431,3421 245,61435,9220 551,67421,68
October 2025
(25.09.2025)
20 029,86411,6520 168,00414,4920 012,76411,30
September 2025
(03.09.2025)
19 681,8019 450,0019 683,83
August 2025
(11.08.2025)
21 439,50444,8620 628,85428,0421 447,48445,02
July 2025
(16.07.2025)
23 541,46482,3824 000,00491,7723 539,97482,35
June 2025
(23.06.2025)
21 818,09452,6518 500,00383,8121 854,16453,40
May 2025
(28.04.2025)
15 389,7216 000,0015 383,14
April 2025
(15.04.2025)
15 367,5915 394,8915 256,64
March 2025
(14.03.2025)
17 562,6917 770,9516 804,96
February 2025
(18.02.2025)
17 596,8416 850,2217 967,83
January 2025
(24.12.2024)
16 330,0315 937,5716 459,44
December 2024
(24.12.2024)
14 818,9414 892,7114 605,19
November 2024
(21.11.2024)
14 909,33342,2414 822,86340,2615 031,93345,06
October 2024
(18.10.2024)
14 495,04323,6014 385,04321,1414 669,51327,49
September 2024
(04.09.2024)
13 835,50303,7913 758,02302,0914 014,31307,72
August 2024
(21.08.2024)
13 046,44284,7413 047,52284,7613 044,66284,70
July 2024
(16.07.2024)
12 655,44282,9512 653,70282,9112 661,79283,09
June 2024
(13.06.2024)
12 278,30282,0512 236,76281,1012 315,36282,90
May 2024
(10.05.2024)
12 525,77295,2012 750,72300,5012 095,26285,06
April 2024
(05.04.2024)
11 204,02264,5711 145,47263,1811 241,27265,45
March 2024
(18.03.2024)
11 172,74264,4711 183,60264,7311 170,16264,41
February 2024
(26.01.2024)
11 750,00287,1711 750,00287,17
January 2024
(10.01.2024)
12 100,00289,3512 100,00289,35
December 2023
(28.11.2023)
12 864,43324,3912 864,43324,39
October 2023
(14.09.2023)
15 232,73387,9215 232,73387,92
September 2023
(05.09.2023)
15 084,47381,9115 084,47381,91
August 2023
(01.08.2023)
12 496,48309,9012 500,00309,9912 492,20309,79
July 2023
(26.06.2023)
10 586,17266,1610 586,17266,16
June 2023
(23.06.2023)
10 653,72265,1210 700,00266,2710 653,56265,11
May 2023
(22.05.2023)
10 815,85273,7010 834,00274,1510 812,96273,62
April 2023
(26.04.2023)
14 944,43370,9614 954,10371,2011 166,67277,19
March 2023
(17.03.2023)
16 287,73420,6916 276,30420,3917 650,00455,87
February 2023
(17.02.2023)
21 383,45546,8319 695,28503,6625 821,26660,31
January 2023
(21.12.2022)
33 581,05865,2239 988,001 030,3032 500,00837,37
December 2022
(29.11.2022)
30 937,67807,7339 988,001 044,0229 108,00759,96
November 2022
(22.11.2022)
28 926,27772,4429 885,41798,0528 333,35756,60
October 2022
(05.10.2022)
40 537,171 120,8039 976,901 105,3140 833,351 128,98
September 2022
(24.08.2022)
39 952,001 100,6739 952,001 100,67
June 2022
(24.05.2022)
29 328,00940,6529 328,00940,65
May 2022
(17.02.2022)
30 640,00959,5430 640,00959,54
April 2022
(17.02.2022)
30 640,00959,5430 640,00959,54
March 2022
(24.02.2022)
40 593,991 223,7932 000,00964,7142 306,591 275,42
February 2022
(22.02.2022)
37 392,061 158,0536 603,681 133,6441 099,741 272,88
January 2022
(25.01.2022)
69 272,362 160,7544 061,281 374,3672 945,262 275,32
December 2021
(15.12.2021)
36 282,331 188,2641 537,201 360,3636 193,531 185,35
November 2021
(29.11.2021)
35 767,541 169,8232 920,331 076,7035 929,951 175,13
October 2021
(22.10.2021)
33 587,311 101,4626 331,29863,5134 063,141 117,07
September 2021
(24.09.2021)
18 505,68595,3320 486,00659,0418 046,83580,57
August 2021
(25.08.2021)
15 669,41503,3711 963,95384,3415 732,05505,39
July 2021
(19.07.2021)
12 987,06404,0711 194,60348,3013 071,22406,68
June 2021
(23.06.2021)
10 757,73331,348 754,77269,6512 145,19374,08
May 2021
(26.05.2021)
9 301,22276,299 103,32270,419 403,72279,34
April 2021
(28.04.2021)
8 098,53241,337 775,13231,698 248,40245,80
March 2021
(26.03.2021)
7 549,69228,557 573,32229,267 546,99228,46
February 2021
(24.02.2021)
8 177,84241,367 930,89234,078 205,51242,17
January 2021
(22.01.2021)
7 924,65230,607 591,10220,908 040,76233,98
December 2020
(21.12.2020)
6 329,75185,615 943,76174,296 344,48186,05
November 2020
(24.11.2020)
6 101,31180,756 186,71183,286 039,92178,93
October 2020
(23.10.2020)
5 983,80179,106 051,60181,135 555,96166,29
September 2020
(22.09.2020)
4 702,90141,664 521,84136,204 853,50146,19
August 2020
(26.08.2020)
4 238,69130,793 560,04109,854 727,24145,86
July 2020
(24.07.2020)
4 087,61126,803 031,4294,044 862,82150,85
June 2020
(24.06.2020)
3 692,34122,582 800,8692,984 582,35152,12
May 2020
(26.05.2020)
3 701,52126,262 526,3586,184 692,85160,08
April 2020
(23.04.2020)
4 698,41159,713 890,97132,264 793,42162,94
March 2020
(26.03.2020)
5 303,24175,214 150,00137,115 306,01175,31
February 2020
(24.02.2020)
5 764,30218,244 537,59171,795 785,74219,05
January 2020
(27.01.2020)
5 737,94213,715 038,03187,645 772,72215,00
December 2019
(23.12.2019)
5 307,08205,33
show all

 

Mo Tu We Th Fr Sa Su
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31

* with the exception of the monthly resource of natural gas under the terms of delivery of the "commercial natural gas metering unit" from February 10, 2023, according to the minutes of the Quotation Commission meeting of UEEX LLC dated February 9, 2023. except for the monthly natural gas resource on the terms of delivery “commercial natural gas metering unit” from February 10, 2023 in accordance with the minutes of the meeting of the Quotation Commission of UEEX LLC dated February 09, 2023 and except for the results of natural gas trading in the section “Purchases of imported natural gas” (“Imported natural gas”) in accordance with the minutes of the meeting of the Quotation Commission of UEEX LLC dated December 27, 2024.

** from February 10, 2023, in accordance with the minutes of the Quotation Commission meeting of UEEX LLC dated February 9, 2023.

GTS   UGS

GTS   UGS

Sales of natural gas in the section "Imported natural gas"

Date Resource Payment terms Delivery terms Volume of supply, thous. cu m Quoted price, UAH per thous. cu m
18.07.2025December 2025AfterpaymentUGS365,2222 325,00
16.07.2025December 2025AfterpaymentUGS358,9722 400,00
21.07.2025November 2025AfterpaymentUGS2 631,5821 744,17
18.07.2025November 2025AfterpaymentUGS782,6122 325,00
16.07.2025November 2025AfterpaymentUGS769,2322 400,00
26.06.2025November 2025AfterpaymentUGS717,3923 000,00
24.06.2025November 2025AfterpaymentUGS3 392,8624 465,79
10.06.2025November 2025AfterpaymentUGS196,0822 500,00
21.07.2025October 2025AfterpaymentUGS2 719,3021 744,17
18.07.2025October 2025AfterpaymentUGS808,7022 325,00
16.07.2025October 2025AfterpaymentUGS794,8722 400,00
26.06.2025October 2025AfterpaymentUGS741,3023 000,00
24.06.2025October 2025AfterpaymentUGS3 505,9524 465,79
10.06.2025October 2025AfterpaymentUGS202,6122 500,00
21.07.2025September 2025AfterpaymentUGS2 631,5821 744,17
18.07.2025September 2025AfterpaymentUGS782,6122 325,00
16.07.2025September 2025AfterpaymentUGS769,2322 400,00
26.06.2025September 2025AfterpaymentUGS717,3923 000,00
24.06.2025September 2025AfterpaymentUGS3 392,8624 465,79
10.06.2025September 2025AfterpaymentUGS196,0822 500,00
21.07.2025August 2025AfterpaymentUGS2 719,3021 744,17
18.07.2025August 2025AfterpaymentUGS808,7022 325,00
16.07.2025August 2025AfterpaymentUGS794,8722 400,00
26.06.2025August 2025AfterpaymentUGS741,3023 000,00
24.06.2025August 2025AfterpaymentUGS3 505,9524 465,79
10.06.2025August 2025AfterpaymentUGS202,6122 500,00
21.07.2025July 2025AfterpaymentUGS2 719,3021 744,17
18.07.2025July 2025AfterpaymentUGS808,7022 325,00
16.07.2025July 2025AfterpaymentUGS794,8722 400,00
26.06.2025July 2025AfterpaymentUGS741,3023 000,00
24.06.2025July 2025AfterpaymentUGS3 505,9524 465,79
10.06.2025July 2025AfterpaymentUGS202,6122 500,00
21.07.2025June 2025AfterpaymentUGS2 631,5821 744,17
26.06.2025June 2025AfterpaymentUGS717,3923 000,00
24.06.2025June 2025AfterpaymentUGS3 392,8624 465,79
10.06.2025June 2025AfterpaymentUGS196,0822 500,00
24.02.2025May 2025AfterpaymentUGS1 491,3026 383,83
24.02.2025May 2025AfterpaymentUGS639,1326 372,97
24.02.2025May 2025AfterpaymentUGS2 556,5226 306,97
24.02.2025May 2025AfterpaymentUGS5 113,0426 356,97
13.02.2025May 2025AfterpaymentUGS3 408,7029 900,00
13.02.2025May 2025AfterpaymentUGS1 704,3529 900,00
13.02.2025May 2025AfterpaymentUGS852,1729 900,00
24.02.2025April 2025AfterpaymentUGS3 195,6526 383,83
24.02.2025April 2025AfterpaymentUGS1 369,5726 372,97
24.02.2025April 2025AfterpaymentUGS5 478,2626 306,97
24.02.2025April 2025AfterpaymentUGS10 956,5226 356,97
19.02.2025April 2025AfterpaymentUGS4 616,3531 042,00
19.02.2025April 2025AfterpaymentUGS4 616,3531 015,00
19.02.2025April 2025AfterpaymentUGS5 193,3931 031,33
13.02.2025April 2025AfterpaymentUGS7 304,3529 900,00
13.02.2025April 2025AfterpaymentUGS3 652,1729 900,00
13.02.2025April 2025AfterpaymentUGS1 826,0929 900,00
12.02.2025April 2025AfterpaymentUGS2 765,0032 260,00
12.02.2025April 2025AfterpaymentUGS6 636,0032 320,00
12.02.2025April 2025AfterpaymentUGS5 530,0032 320,00
24.02.2025March 2025AfterpaymentUGS3 302,1726 383,83
24.02.2025March 2025AfterpaymentUGS1 415,2226 372,97
24.02.2025March 2025AfterpaymentUGS5 660,8726 306,97
24.02.2025March 2025AfterpaymentUGS11 321,7426 356,97
19.02.2025March 2025AfterpaymentUGS10 221,9131 042,00
19.02.2025March 2025AfterpaymentUGS10 221,9131 015,00
19.02.2025March 2025AfterpaymentUGS11 499,6531 031,33
13.02.2025March 2025AfterpaymentUGS7 547,8329 900,00
13.02.2025March 2025AfterpaymentUGS3 773,9129 900,00
13.02.2025March 2025AfterpaymentUGS1 886,9629 900,00
12.02.2025March 2025AfterpaymentUGS6 122,5032 260,00
12.02.2025March 2025AfterpaymentUGS14 694,0032 320,00
12.02.2025March 2025AfterpaymentUGS12 245,0032 320,00
17.01.2025March 2025AfterpaymentUGS2 733,7723 451,00
16.01.2025March 2025AfterpaymentUGS8 201,3023 116,67
15.01.2025March 2025AfterpaymentUGS5 467,5324 113,95
15.01.2025March 2025AfterpaymentUGS2 733,7724 047,95
14.01.2025March 2025AfterpaymentUGS5 467,5324 145,50
14.01.2025March 2025AfterpaymentUGS2 733,7724 145,50
10.01.2025March 2025AfterpaymentUGS2 733,7721 931,62
10.01.2025March 2025AfterpaymentUGS1 366,8821 931,62
09.01.2025March 2025AfterpaymentUGS1 366,8822 396,00
08.01.2025March 2025AfterpaymentUGS1 366,8823 662,80
07.01.2025March 2025AfterpaymentUGS1 366,8824 116,00
06.01.2025March 2025AfterpaymentUGS2 050,3325 788,00
03.01.2025March 2025AfterpaymentUGS15 035,7226 741,19
03.01.2025March 2025AfterpaymentUGS1 366,8826 741,19
03.01.2025March 2025AfterpaymentUGS6 834,4226 741,19
03.01.2025March 2025AfterpaymentUGS683,4426 741,19
19.02.2025February 2025AfterpaymentUGS2 637,9131 042,00
19.02.2025February 2025AfterpaymentUGS2 637,9131 015,00
19.02.2025February 2025AfterpaymentUGS2 967,6531 031,33
12.02.2025February 2025AfterpaymentUGS1 777,5032 260,00
12.02.2025February 2025AfterpaymentUGS4 266,0032 320,00
12.02.2025February 2025AfterpaymentUGS3 555,0032 320,00
17.01.2025February 2025AfterpaymentUGS2 469,2123 451,00
16.01.2025February 2025AfterpaymentUGS7 407,6323 116,67
15.01.2025February 2025AfterpaymentUGS4 938,4224 113,95
15.01.2025February 2025AfterpaymentUGS2 469,2124 047,95
14.01.2025February 2025AfterpaymentUGS4 938,4224 145,50
14.01.2025February 2025AfterpaymentUGS2 469,2124 145,50
10.01.2025February 2025AfterpaymentUGS2 469,2121 931,62
10.01.2025February 2025AfterpaymentUGS1 234,6021 931,62
09.01.2025February 2025AfterpaymentUGS1 234,6022 396,00
08.01.2025February 2025AfterpaymentUGS1 234,6023 662,80
07.01.2025February 2025AfterpaymentUGS1 234,6024 116,00
06.01.2025February 2025AfterpaymentUGS1 851,9125 788,00
03.01.2025February 2025AfterpaymentUGS13 580,6526 741,19
03.01.2025February 2025AfterpaymentUGS1 234,6026 741,19
03.01.2025February 2025AfterpaymentUGS6 173,0226 741,19
03.01.2025February 2025AfterpaymentUGS617,3026 741,19
show all

Sale of natural gas in the section "Cross-border", "Customs warehouse"

Date Product Customs regime Unit of measurement Sales volume Quoted price, EUR
09.01.2026Natural gasImportMWh26 040,0034,80
08.01.2026Natural gasImportMWh26 040,0034,58
07.01.2026Natural gasImportMWh26 040,0035,60
05.01.2026Natural gasImportMWh22 320,0035,06
31.12.2025Natural gasImportMWh37 200,0035,60
30.12.2025Natural gasImportMWh37 200,0035,35
29.12.2025Natural gasImportMWh37 200,0035,77
24.12.2025Natural gasImportMWh37 200,0035,60
23.12.2025Natural gasImportMWh37 200,0034,85
22.12.2025Natural gasImportMWh44 640,0035,39
19.12.2025Natural gasImportMWh55 800,0035,75
18.12.2025Natural gasImportMWh52 080,0034,90
17.12.2025Natural gasImportMWh52 080,0034,73
16.12.2025Natural gasImportMWh59 520,0034,65
15.12.2025Natural gasImportMWh52 080,0035,40
15.12.2025Natural gasImportMWh52 080,0035,25
15.12.2025Natural gasImportMWh37 200,0035,40
12.12.2025Natural gasImportMWh37 200,0035,45
12.12.2025Natural gasImportMWh74 400,0035,45
12.12.2025Natural gasImportMWh74 400,0035,45
10.12.2025Natural gasImportMWh37 200,0034,70
10.12.2025Natural gasImportMWh33 600,0035,20
08.12.2025Natural gasImportMWh67 200,0035,65
05.12.2025Natural gasImportMWh50 400,0035,80
04.12.2025Natural gasImportMWh13 440,0036,00
04.12.2025Natural gasImportMWh33 600,0036,10
04.12.2025Natural gasImportMWh14 880,0036,00
03.12.2025Natural gasImportMWh33 600,0036,55
03.12.2025Natural gasImportMWh33 600,0036,55
03.12.2025Natural gasImportMWh37 200,0036,55
03.12.2025Natural gasImportMWh33 600,0036,42
02.12.2025Natural gasImportMWh33 600,0036,30
02.12.2025Natural gasImportMWh33 600,0036,30
01.12.2025Natural gasImportMWh67 200,0036,55
27.11.2025Natural gasImportMWh37 200,0037,55
26.11.2025Natural gasImportMWh52 080,0037,97
26.11.2025Natural gasImportMWh74 400,0037,87
26.11.2025Natural gasImportMWh37 200,0037,90
25.11.2025Natural gasImportMWh186 000,0038,12
24.11.2025Natural gasImportMWh37 200,0038,20
21.11.2025Natural gasImportMWh111 600,0039,08
21.11.2025Natural gasImportMWh74 400,0038,90
20.11.2025Natural gasImportMWh74 400,0039,18
19.11.2025Natural gasImportMWh74 400,0039,05
17.11.2025Natural gasImportMWh130 200,0039,39
14.11.2025Natural gasImportMWh111 600,0039,21
13.11.2025Natural gasImportMWh130 200,0039,32
12.11.2025Natural gasImportMWh74 400,0039,72
11.11.2025Natural gasImportMWh111 600,0039,25
10.11.2025Natural gasImportMWh10 200,0039,05
10.11.2025Natural gasImportMWh37 200,0039,35
10.11.2025Natural gasImportMWh111 600,0039,08
07.11.2025Natural gasImportMWh148 800,0039,30
06.11.2025Natural gasImportMWh74 400,0039,46
06.11.2025Natural gasImportMWh119 040,0039,48
05.11.2025Natural gasImportMWh33 480,0039,60
04.11.2025Natural gasImportMWh143 520,0039,30
03.11.2025Natural gasImportMWh34 560,0039,00
31.10.2025Natural gasImportMWh96 720,0038,40
05.09.2025Natural gasImportMWh11 160,0038,40
02.09.2025Natural gasImportMWh74 400,0036,98
01.09.2025Natural gasImportMWh37 200,0036,35
28.07.2025Natural gasImportMWh74 400,0037,65
18.07.2025Natural gasImportMWh29 760,0040,80
15.07.2025Natural gasImportMWh29 760,0041,43
14.07.2025Natural gasImportMWh14 880,0043,30
24.06.2025Natural gasBonded Warehouse + short-haulthous. cu m100,00480,00
show all